Not a member yet? Why not Sign up today
Create an account  

Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Unable to Set Minimum Quality of Production

#5
I need it all the time. As an example:

I am trying to produce a product which requires inputs one and two at Q255. Both inputs need to be shipped into the system. The shipment time on input one is ten minutes and the shipment time on input 2 is 40 minutes. The sequence of events that results is:

1. The Input one shipment arrives in the system.
2. Manufacturing processes begin consuming this resource.
3. Most or all of this shipment of resources is consumed in the thirty minutes between now and when the shipment of input 2 arrives.
4. Shipment of input 2 arrives.
5. The resources that came in shipment 2 face the same issues input 1 had in parts 2 and 3.

The result is that almost no Q255 products are actually made. In any case, the feature is there, this is just a comment that it isn't currently working.
Reply



Messages In This Thread
RE: Unable to Set Minimum Quality of Production - by Mr. Mortius - 09-26-2018, 11:29 PM

Forum Jump:


Users browsing this thread:
1 Guest(s)